Dexion prepaired HI280 shelving with flooring for future expansion

  • Dexion_Referenties_Mastermate_1
  • Dexion_Referenties_Mastermate_2

Dexion prepaired HI280 shelving with flooring for future expansion

Mastermate is a technical wholesaler for construction and construction-related businesses and let Dexion establish the new warehouse with existing shelving supplemented with new HI280 shelving with flooring.

HI280 shelving with floor construction

Dexion used the existing warehouse equipment, complemented by new shelving. When installing the HI280 floor construction, Dexion has ensured that this floor construction is prepared for expansion of another floor. There were also pallet racking, A-racking for long good storage and conveyors delivered.

Results:

  • Cost savings by using existing racks
  • Storage of long goods in A-racking
  • HI280 floor construction prepared for an extra floor, saving costs by the next expansion
  • Short lead time, making the company quickly operational after moving

Delivered products:

HI280 shelving with flooring, conveyors, Pallet Racking type P90 and A-racking.